No Objection Certification (NOC) Stone Crushing Unit

Environmental Protection Agency (EPA)

Processing Time

15 days

Validity

1 Years

Sections

4

Documents

9

Description

The No Objection Certificate (NOC) for Stone Crushing Unit is a mandatory legal document required for establishing and operating a stone crushing unit. This certificate ensures that the proposed site and operations comply with environmental regulations, land use criteria, and other statutory requirements set by concerned government departments such as the Environment Protection Agency (EPA), Mines & Minerals Department, and Local Administration.

Obtaining the NOC involves a formal application process, inspection of the site, and evaluation of the potential environmental, health, and safety impacts.

Sections
  • Part !: Owner / Company Information

    FORM A

  • Part II: Project Information

    Form A

  • Undertaking

    I do solemnly affirm and declare that the information given above and contained in the attached documents are true and correct to the best of my knowledge.

  • Part III: Field Survey Report

    Form A

Required Documents
  • Land Ownership Certificate
    In case selected Land Ownership = Self Owned
  • Rent Agreement
    In case selected Land Ownership = Rented
  • Agreement with Community
    In case selected Land Ownership = Community Owned
  • Google Colored Location Map
  • Plant Design
  • List of Machinery and Equipment
  • List of Number and Kind of Workforce
  • Approval of Electricity Connection
    In case selected Electricity Source = Water and Power Department or Both
  • Approval of Water Supply Connection
    In case selected Water Source = WASA or Both
Fee Schedules
Category Registration Fee Renewal Fee
Production Capacity Up to 100 Cubic Feet Per Day 2000.00 1000.00
Production Capacity From 101 to 300 Cubic Feet Per Day 2500.00 1200.00
Production Capacity From 301 to 500 Cubic Feet Per Day 3000.00 1500.00
Production Capacity From 501 to 700 Cubic Feet Per Day 3500.00 1700.00
Production Capacity From 701 to 1000 Cubic Feet Per Day 4000.00 1800.00
Production Capacity From 1001 and Above Cubic Feet Per Day 4500.00 1999.93
Approval Workflow
1
Part !: Owner / Company Information
Field Assistant
Order: 1
2
Part II: Project Information
Assistant Director Enforcement
Order: 2
3
Undertaking
Assistant Director Legal
Order: 3
4
Part III: Field Survey Report
Assistant Director Enforcement
Order: 4
5
Document Verification
Field Assistant
Order: 4
6
Fee Verification
Assistant Director Enforcement
Order: 6