Establishment of Industrial Unit in GB

Environmental Protection Agency (EPA)

Processing Time

15 days

Validity

1 Years

Sections

4

Documents

9

Description

Establishing an industrial unit in Gilgit-Baltistan (GB) requires obtaining multiple clearances and NOCs from relevant government departments such as:

Environmental Protection Agency (GB-EPA)

Industries and Commerce Department

Local Government/RDA/Municipal Corporation

Electricity/Water Departments

Board of Investment (for large-scale or foreign investment)

The application involves submitting detailed information about the proposed industry, including land acquisition, environmental impact, infrastructure needs, and production processes.

🏭 Applicable Industries

  • Mineral processing units
  • Food/agriculture-based industries
  • Hydro-power generation
  • Manufacturing plants
  • Construction material factories (e.g., cement, bricks, crush plants)
  • Cold storage or packaging units
Sections
  • Part 1: Proponent / Company Information

    FORM A

  • Part 2: Project Information

    Form A

  • Part III: Field Survey Report

    Form A - Field Survey Report

  • Form H - Undertaking

    I do  hereby solemnly affirm and declare that I fully understand and accept the conditions contained in the regulations and NOC accorded by GB-EPA and undertake to install and operate the plant strictly in accordance with the said conditions

Required Documents
  • Land Ownership Certificate
    In case selected Land Ownership = Self Owned Land
  • Rent Agrement
    In case selected Land Ownership = Rented
  • Agreement with Community
    In case selected Land Ownership = Community Owned
  • Location Map
    Colored Google Map
  • Plant Design
  • Machinery / Equipment List
  • List of Number and Kind of Workforce
  • Approval of Electricity Connection
    In case selected Electricity Source = Water and Power Department or Both
  • Approval of Water Supply Connection
    In case selected Water Source = WASA or Both
Fee Schedules
Category Registration Fee Renewal Fee
Cottage Industry 2000.00 1000.00
Small Industries 2500.00 1200.00
Medium Industries 3000.00 1500.00
Flour Mills 3500.00 1699.98
Marble Processing Industry 4000.00 1799.99
Approval Workflow
1
Part 1: Proponent / Company Information
Master Admin
Order: 1
2
Part 2: Project Information
Master Admin
Order: 2
3
Part III: Field Survey Report
Master Admin
Order: 3
4
Form H - Undertaking
Master Admin
Order: 4
5
Document Verification
Master Admin
Order: 5
6
Fee Verification
Master Admin
Order: 6