Installation of Automatic Weather Station, Water Gauging Station, Environmental Monitoring Station or any Other

Environmental Protection Agency (EPA)

Processing Time

17 days

Validity

5 Years

Sections

3

Documents

8

Description

The application form for installation of an Automatic Weather Station (AWS), Water Gauging Station, Environmental Monitoring Station, or similar scientific equipment is a formal request submitted to the relevant regulatory authority (e.g., EPA, Meteorological Department, Irrigation Department). The objective is to seek official No Objection Certificate (NOC) or approval for installing monitoring infrastructure that collects environmental, hydrological, or meteorological data.

🔧 Purpose of Installation

Automatic Weather Station: For collecting real-time weather data like temperature, humidity, rainfall, wind speed, and direction.

Water Gauging Station: For monitoring river/stream water levels and flow rates for flood forecasting or irrigation planning.

Environmental Monitoring Station: For tracking air, water, or soil pollution, radiation levels, or noise.

📑 Typical Contents of the Form

Applicant’s details (name, organization, contact)

Purpose and justification for installation

Technical specifications of equipment

Exact GPS coordinates & site photos

Land ownership or lease documents

NOCs from relevant authorities (if required)

Implementation plan and timeline

Sections
  • Application Form

    Schedule I

    Application Form

    For the purpose of Installation of Automatic Weather Station, Water Gauging Station, Environmental Monitoring Station or any other

  • Acknowledgement

    I agree the information provided is accurate to the best of my knowledge

  • Inspection Report

    Form Inspection Report

Required Documents
  • Duly Filed Application Form
  • Registration Fee Challan
    Visible Copy
  • Master Plan of the Facility
    Master plan of the facility along with detailed map/design of the project covering building location, parking area, walkways and green areas and total covered area of the facility
  • Google Earth Map of Area
    Google Earth map of area with clear coordinates and land demarcation
  • Land Ownership Document
    Aks-e-Shajra, Intiqal, Jama Bandi and Khasra Girdawari
  • Waste Water Management Plan
    Waste water management plan with clear line plans for disposal of black, brown and grey water
  • Exact Location & Internal Designs
    Exact location and internal designs of soakage pit, grease trap and septic tank
  • Documents Check
    Submit all pre-requisites on A3-size color paper, along with 3D images, (soft) upload all mentioned documents on the portal and hard copies to the agency for further necessary action under GBEPA 2014
Fee Schedules
Category Registration Fee Renewal Fee
Free 0.00 0.00
Approval Workflow
1
Application Form
Master Admin
Order: 1
2
Acknowledgement
Master Admin
Order: 2
3
Inspection Report
Master Admin
Order: 3
4
Document Verification
Master Admin
Order: 4
5
Fee Verification
Master Admin
Order: 5